head_banner

LifenGas Delivers VPSA Oxygen Plant for Deli-JW Glassware in Pakistan, Driving Efficiency and Sustainable Growth

Highlights:

1、LifenGas's VPSA oxygen project in Pakistan is now stably operational, exceeding all specification targets and achieving full capacity.

2、The system uses advanced VPSA technology tailored for glass furnaces, offering high efficiency, stability, and automation.

3、The team swiftly completed installation despite regional political conflict challenges, saving the client over USD 1.4 million yearly and boosting competitiveness.

4、This landmark project highlights the company’s global technical expertise and commitment to innovative low-carbon solutions.

 

LifenGas is proud to announce the successful commissioning of a VPSA oxygen generation system for Deli-JW Glassware Co., Ltd. in Pakistan. The project has now entered stable operation, with all performance indicators meeting or exceeding design expectations. This marks another important milestone in our mission to provide advanced industrial gas solutions that support sustainable production and business growth.

The system was designed using advanced VPSA (Vacuum Pressure Swing Adsorption) oxygen technology tailored for glass furnace combustion. The plant delivers a rated oxygen output of 600 Nm³/h at a purity level above 93%, with outlet pressure consistently maintained above 0.4 MPaG. The technology combines low energy consumption, stable output, and high automation, ensuring a reliable and efficient supply of oxygen for the customer’s operations.
LifenGas's VPSA oxygen

Despite the challenges of cross-border war conflict and complex on-site conditions, the project progressed smoothly and swiftly. Installation was completed in 60 days, and commissioning in 7 days.

 

The VPSA system is now running smoothly, providing Deli-JW with a cost-effective oxygen supply that increases gas supply reliability. By producing oxygen on-site compared to purchased liquid oxygen, the system is projected to reduce the client’s annual production costs by over USD 1.4 million, significantly enhancing competitiveness and supporting sustainable operational growth.
advanced VPSA technology

The successful delivery of this project further underscores LifenGas’s reputation for technical expertise, execution excellence, and customer commitment in the global gas industry. It also stands as another benchmark showcasing excellent overseas customer service.

Looking ahead, LifenGas will continue to advance its VPSA technology and project delivery capabilities, bringing efficient, low-carbon, and dependable on-site gas solutions to more customers around the world.

 

Dongcheng Pan

Dongcheng Pan

As the Design and Commissioning Engineer for this project, Dongcheng Pan was responsible for process and equipment design. He also supervised on-site construction and system debugging throughout the entire process. His contributions played a vital role in ensuring the successful launch and stable operation of the project.


Post time: Sep-08-2025
  • Corporate brand story (8)
  • Corporate brand story (7)
  • Corporate brand story (9)
  • Corporate brand story (11)
  • Corporate brand story (12)
  • Corporate brand story (13)
  • Corporate brand story (14)
  • Corporate brand story (15)
  • Corporate brand story (16)
  • Corporate brand story (17)
  • Corporate brand story (18)
  • Corporate brand story (19)
  • Corporate brand story (20)
  • Corporate brand story (22)
  • Corporate brand story (6)
  • Corporate-brand-story
  • Corporate-brand-story
  • Corporate-brand-story
  • Corporate-brand-story
  • Corporate-brand-story
  • Corporate brand story
  • KIDE1
  • 豪安
  • 联风6
  • 联风5
  • 联风4
  • 联风
  • HONSUN
  • 安徽德力
  • 本钢板材
  • 大族
  • 广钢气体
  • 吉安豫顺
  • 锐异
  • 无锡华光
  • 英利
  • 青海中利
  • 浙江中天
  • aiko
  • 深投控
  • 联风4
  • 联风5
  • lQLPJxEw5IaM5lFPzQEBsKnZyi-ORndEBz2YsKkHCQE_257_79